A group captive solar project is a large utility-scale solar plant where multiple consumers jointly invest minimum 26% equity and must consume 51% of the power generated. It allows industries and commercial establishments to purchase solar power at reduced tariffs.
Any commercial or industrial consumer with a 11kV to 110kV HT connection can buy power via the group captive model.
Group captive projects usually start from 5 MW to 500 MW depending on consumer demand.
Consumers typically invest:
Group captive solar tariffs in India:
₹3.80 – ₹5.50 per unit (state dependent)
Inclusive of: Transmission, Wheeling, Banking, and O&M charges.
Power Purchase Agreements (PPA) are typically 15–25 years.
Consumers must ensure consumption of 51% of project generation annually; otherwise penalties apply as per open access guidelines.
A Special Purpose Vehicle (SPV) is created:
• Developers hold majority equity
• Consumers jointly hold minimum 26% equity
Electricity is supplied exclusively to captive consumers.
Average payback for industries: 2–4 years through monthly electricity savings.
1 MW of solar requires approx. 4–5 acres of non-agricultural land.
A solar rooftop system is a photovoltaic (PV) installation mounted on the roof of residential, commercial, or industrial buildings to generate electricity using sunlight. It can be on-grid, hybrid, or off-grid.
Solar panels convert sunlight into DC → inverter converts DC to AC → appliances consume the power → extra power is exported to the grid (on-grid systems) generating electricity credits.
Yes, most states allow net metering for residential & commercial users.
Approx. 100 sq.ft per kW.
Residential: ₹45,000–₹65,000/kW (post-subsidy)
Commercial/Industrial: ₹35,000–₹50,000/kW
Under PM-Surya Ghar Muft Bijli Yojana:
1–3 kW: ₹18,000/kW
3–10 kW: ₹9,000/kW
Above 10 kW: as per guidelines. No subsidy for commercial/industrial.
Panels: 25–30 yrs
Inverters: 5–10 yrs
Structure: 20+ yrs
1 kW → 4 to 5 units/day depending on weather.
• Clean panels twice a month
• Annual wiring & inverter check
• Performance monitoring via app/portal
Yes. Many banks/NBFCs offer EMI at 7–10% for 3–5 years.
Installation: 3–7 days
Net metering approval: 2–6 weeks
On-grid: No
Hybrid/Off-grid: Yes (battery backup)
• Electricity bill
• Aadhaar (residential subsidy)
• Property ownership proof
• DISCOM registration
• Bank details for subsidy
No. Systems use non-invasive mounts & protect roof from heat/UV damage.